Flood Evacuation Warning and Environmental Information

Flood Level (Peil Banjir) is a designated elevation or height reference used to determine a safe threshold against potential flooding, inundation, or water overflow during flood events

Flood Level

Understanding Flood Evacuation Warning and Environmental Information

Importance of Flood Level Determination

Flood Level Determination (Peil Banjir) refers to the establishment of a specific elevation or height benchmark used as a reference to define a safe threshold against potential flooding, inundation, or water overflow during flood events. This benchmark is applied in spatial planning, infrastructure development, and flood management to ensure that buildings, public facilities, and residential areas are constructed at elevations that minimize flood risks.

Validity Period

The validity of a flood level determination depends on the relevance of the supporting data and prevailing environmental conditions. It remains applicable as long as there are no significant changes in hydrological conditions, drainage systems, land use, or other factors that may affect flood risk and water levels.

Benefits and Importance

Flood level determination serves as a critical reference in spatial planning and development projects aimed at mitigating flood risks. By establishing a safe elevation benchmark, government agencies, developers, and stakeholders can determine appropriate construction levels for buildings, infrastructure, and residential areas, thereby reducing potential property damage and safeguarding public safety.

Processing Time

The processing time for obtaining a flood level determination generally depends on the completeness of the submitted documents and the verification process conducted by the relevant authorities. When all administrative requirements and technical data are available, document review and site inspections can typically be completed within a relatively short period, in accordance with the service standards of the respective jurisdiction.

Technical planning and document review

Why Flood Evacuation Warning and Environmental Information Matters

Proper preparation helps you understand technical and administrative needs before work begins. Reviewing the project early allows the next steps to reflect your priorities.

  • Identify the documents and information to prepare.
  • Anticipate issues that could affect the work.
  • Determine next steps based on project needs and conditions.

Our Service Scope

Needs Assessment

Review the initial conditions, objectives, and supporting information to identify service needs.

Document Review

Review document completeness and identify information that still needs to be provided.

Technical Support

Support implementation and technical coordination within the agreed scope of work.

Results and Next Steps

Present the work results along with relevant notes and recommended next steps.

Why Choose Us

Tailored to Your Project

Your project needs and conditions guide the approach to the work.

Open Communication

Needs, progress, and issues are discussed together so the next steps are understood.

Work Timeline

Timing is discussed after reviewing the scope and document readiness. The schedule takes account of work complexity and any external processes.

Work Documentation

Information, notes, and work results are organized to support your next steps.

Collaborative Coordination

Coordination with your contact person helps align documents, access, and implementation.

Next-Step Guidance

Review results are explained so you know what to complete or follow up on.

Requirements

Flood Level (Peil Banjir)

General Requirements

  • Copy of the Company's Articles of Association and Deed of Establishment
  • Copy of PKKPR (Approval of Conformity for Spatial Utilization Activities)
  • Copy of the Applicant’s National Identity Card (KTP) and Taxpayer Identification Number (NPWP)
  • Copy of the Business Identification Number (NIB)
  • Copy of the Land Certificate or Land Ownership Documents
  • Location Coordinates
  • Block Plan Drawing (DWG/CAD Format)
  • Statement Letter Issued by the Village Head Confirming the Use of Village Drainage Channels for Stormwater Runoff from the Residential Development
  • Proposed Site Plan and Location Map

Technical Requirements

  • Application Letter for Flood Level Determination and Notarized Declaration of Willingness to Demolish, Executed on a Duty Stamp (Meterai)
  • Copy of the Previous Flood Level Recommendation and Land Ownership Certificate (Applicable for Development or Expansion Projects)
  • Site Photographs and Documentation of Surrounding Drainage Infrastructure
On-site project work

Work Flow

Flood Level (Peil Banjir)

  1. 01

    Document Verification

    Conduct verification of administrative documents and supporting data to ensure the completeness of requirements for the flood level determination process

  2. 02

    Application Submission to the Public Works and Highways Agency (Dinas Bina Marga)

    Submit the application to the Public Works and Highways Agency (Dinas Bina Marga) as part of the flood level determination process in accordance with applicable regulations and requirements

  3. 03

    Conformity Assessment

    Conduct an assessment of the submitted data and site conditions to ensure compliance with the technical requirements for flood level determination

  4. 04

    Administrative Verification and Site Inspection

    Conduct administrative verification and site inspections to ensure the accuracy of submitted data, the suitability of site conditions, and compliance with applicable requirements and regulations

  5. 05

    Issuance of Flood Level Determination

    The Flood Level Determination document is issued after all stages of verification, evaluation, and site inspection have been completed and confirmed to comply with the applicable requirements and regulations.