Site Plan / General Planning Arrangement (GPA) Drawing

A site plan is a detailed drawing that illustrates the layout of a land area or development site, showing the placement of buildings, access roads, utilities, open spaces, and other supporting elements

Site Plan / GPA
05 service stages

Clear Requirements

Documents and technical scope are mapped from the beginning.

Guided Process

Each stage is handled with structured coordination and reporting.

Compliance Focus

The work is aligned with relevant technical and administrative standards.

Service Overview

The Importance of a Site Plan / GPA in Supporting Your Building Development

A site plan is a detailed drawing of a land area or development site that illustrates the placement of buildings, road access, utilities, open spaces, and other supporting elements. This document serves as a key reference in planning and executing construction activities to ensure compliance with applicable spatial planning, technical standards, and permitting regulations.

Validity Period

The validity period of a site plan refers to the timeframe during which the approved layout plan may be used as a reference for construction activities. During this period, the site plan serves as the official basis to ensure that development is carried out in accordance with the approved design and the requirements set by the relevant authorities.

Benefits and Importance

A site plan serves as a guideline for orderly, efficient, and regulation-compliant development, including the arrangement of building placement, access routes, and utility systems. Its importance lies in preventing irregular development and ensuring that all construction activities follow the approved planning framework, thereby avoiding land-use conflicts and supporting structured urban development.

Processing Time

The processing time for a site plan generally depends on document completeness, the complexity of the development proposal, and the technical review process conducted by the relevant authorities. If all requirements are complete and no revisions are needed, the administrative review and technical assessment can typically be completed within a relatively short timeframe in accordance with local service standards.

Work Flow

Submission of Site Plan / GPA Application

01

Administrative Document Verification

Conduct verification of administrative documents to ensure completeness and compliance with the requirements in the Site Plan / General Planning Arrangement (GPA) preparation process

02

Site Technical Data Collection

Collect technical data of the site as the basis for preparing the Site Plan / General Planning Arrangement (GPA), ensuring alignment with existing site conditions and applicable regulations

03

Site Plan Drawing Preparation and Submission

Prepare and submit the Site Plan drawings based on site technical data and applicable spatial planning regulations

04

Administrative Verification and Technical Assessment

Conduct administrative verification and technical assessment to ensure that the Site Plan is in compliance with applicable spatial planning regulations and requirements

05

Issuance and Approval of Site Plan

The Site Plan is issued and approved after all administrative verification and technical assessment processes have been completed and confirmed to comply with applicable requirements and regulations

Requirements

Submission of Site Plan / GPA Application

General Requirements

  • Copy of the Applicant’s National Identity Card (KTP) and Taxpayer Identification Number (NPWP)
  • Copy of the Company’s Deed of Establishment and Business Identification Number (NIB) for Legal Entity Applicants
  • Copy of Land Certificate or Proof of Land Ownership/Legal Control of Land
  • Approval of Spatial Utilization Conformity (PKKPR)

Technical Requirements

  • Application Letter for Site Plan (GPA) Approval
  • Geographical Coordinates of the Land Parcel
  • Site Location Map and Development Layout Plan
  • Site Plan Technical Drawing in DWG/CAD File Format
  • Information on Land Use Allocation and Land Area Size
  • Photographs of Existing Land Conditions and Surrounding Environment
  • Additional Supporting Documents as Required by Applicable Local Government Regulations