PT Parama Karya Enjineering

Site Plan / General Planning Arrangement (GPA) Drawing

A site plan is a detailed drawing that illustrates the layout of a land area or development site, showing the placement of buildings, access roads, utilities, open spaces, and other supporting elements

Site Plan / GPA

Understanding Site Plan / General Planning Arrangement (GPA) Drawing

The Importance of a Site Plan / GPA in Supporting Your Building Development

A site plan is a detailed drawing of a land area or development site that illustrates the placement of buildings, road access, utilities, open spaces, and other supporting elements. This document serves as a key reference in planning and executing construction activities to ensure compliance with applicable spatial planning, technical standards, and permitting regulations.

Validity Period

The validity period of a site plan refers to the timeframe during which the approved layout plan may be used as a reference for construction activities. During this period, the site plan serves as the official basis to ensure that development is carried out in accordance with the approved design and the requirements set by the relevant authorities.

Benefits and Importance

A site plan serves as a guideline for orderly, efficient, and regulation-compliant development, including the arrangement of building placement, access routes, and utility systems. Its importance lies in preventing irregular development and ensuring that all construction activities follow the approved planning framework, thereby avoiding land-use conflicts and supporting structured urban development.

Processing Time

The processing time for a site plan generally depends on document completeness, the complexity of the development proposal, and the technical review process conducted by the relevant authorities. If all requirements are complete and no revisions are needed, the administrative review and technical assessment can typically be completed within a relatively short timeframe in accordance with local service standards.

Technical planning and document review

Why Site Plan / General Planning Arrangement (GPA) Drawing Matters

Proper preparation helps you understand technical and administrative needs before work begins. Reviewing the project early allows the next steps to reflect your priorities.

  • Identify the documents and information to prepare.
  • Anticipate issues that could affect the work.
  • Determine next steps based on project needs and conditions.

Our Service Scope

Needs Assessment

Review the initial conditions, objectives, and supporting information to identify service needs.

Document Review

Review document completeness and identify information that still needs to be provided.

Technical Support

Support implementation and technical coordination within the agreed scope of work.

Results and Next Steps

Present the work results along with relevant notes and recommended next steps.

Why Choose Us

Tailored to Your Project

Your project needs and conditions guide the approach to the work.

Open Communication

Needs, progress, and issues are discussed together so the next steps are understood.

Work Timeline

Timing is discussed after reviewing the scope and document readiness. The schedule takes account of work complexity and any external processes.

Work Documentation

Information, notes, and work results are organized to support your next steps.

Collaborative Coordination

Coordination with your contact person helps align documents, access, and implementation.

Next-Step Guidance

Review results are explained so you know what to complete or follow up on.

Requirements

Submission of Site Plan / GPA Application

General Requirements

  • Copy of the Applicant’s National Identity Card (KTP) and Taxpayer Identification Number (NPWP)
  • Copy of the Company’s Deed of Establishment and Business Identification Number (NIB) for Legal Entity Applicants
  • Copy of Land Certificate or Proof of Land Ownership/Legal Control of Land
  • Approval of Spatial Utilization Conformity (PKKPR)

Technical Requirements

  • Application Letter for Site Plan (GPA) Approval
  • Geographical Coordinates of the Land Parcel
  • Site Location Map and Development Layout Plan
  • Site Plan Technical Drawing in DWG/CAD File Format
  • Information on Land Use Allocation and Land Area Size
  • Photographs of Existing Land Conditions and Surrounding Environment
  • Additional Supporting Documents as Required by Applicable Local Government Regulations
On-site project work

Work Flow

Submission of Site Plan / GPA Application

  1. 01

    Administrative Document Verification

    Conduct verification of administrative documents to ensure completeness and compliance with the requirements in the Site Plan / General Planning Arrangement (GPA) preparation process

  2. 02

    Site Technical Data Collection

    Collect technical data of the site as the basis for preparing the Site Plan / General Planning Arrangement (GPA), ensuring alignment with existing site conditions and applicable regulations

  3. 03

    Site Plan Drawing Preparation and Submission

    Prepare and submit the Site Plan drawings based on site technical data and applicable spatial planning regulations

  4. 04

    Administrative Verification and Technical Assessment

    Conduct administrative verification and technical assessment to ensure that the Site Plan is in compliance with applicable spatial planning regulations and requirements

  5. 05

    Issuance and Approval of Site Plan

    The Site Plan is issued and approved after all administrative verification and technical assessment processes have been completed and confirmed to comply with applicable requirements and regulations